Product Details
Place of Origin: Guangdong, China
Brand Name: Zhonghe
Certification: CE
Model Number: SSB001
Payment & Shipping Terms
Minimum Order Quantity: 1 piece
Price: $8000-$12000/pieces
Packaging Details: wood case
Delivery Time: 20-30 work day
Payment Terms: T/T
Supply Ability: 60 Piece/Pieces per Month
Place Of Origin: |
Guangdong, China |
Suitable Excavator(ton): |
20-50T |
Product Name: |
Excavator Telescopic Boom |
Marketing Type: |
New Product 2022 |
After-sales Service Provided: |
Online Support |
Color: |
Yellow/Gray/Red/Green/Customizable |
Material: |
Q355B |
Application: |
Excavator Attachment |
Condition: |
100%New |
Applicable Industries: |
Construction Works,Machinery Repair Shops,Energy & Mining,Building Material Shops |
Weight: |
2700-9000KGS |
Packing: |
Bubble Bag Packaging |
Capacity: |
0.4-0.8 Cbm |
MOQ: |
1 PCS |
Place Of Origin: |
Guangdong, China |
Suitable Excavator(ton): |
20-50T |
Product Name: |
Excavator Telescopic Boom |
Marketing Type: |
New Product 2022 |
After-sales Service Provided: |
Online Support |
Color: |
Yellow/Gray/Red/Green/Customizable |
Material: |
Q355B |
Application: |
Excavator Attachment |
Condition: |
100%New |
Applicable Industries: |
Construction Works,Machinery Repair Shops,Energy & Mining,Building Material Shops |
Weight: |
2700-9000KGS |
Packing: |
Bubble Bag Packaging |
Capacity: |
0.4-0.8 Cbm |
MOQ: |
1 PCS |
Excavator telescopic arm 25M 32M 30M is optional for PC410
✅ 1. Made of BS900 material, it is lighter in weight, has smaller host load, is more fuel-efficient and moves faster.
✅2. The design of the optional auxiliary rope and bucket allows the telescopic arm to use not only the grab bucket, but also the bucket.
✅3. The design of enlarged pulleys and thickened steel wire ropes can carry greater load-bearing strength, extend the service life of ✅accessories, and make the overall quality more stable.
✅4. Use the same quality wire rope as rotary excavation, and adopt bearings imported from Japan, which are better equipped in the same level.
✅5. Unique design, the wire rope and high-pressure hose can be replaced without disassembling the arm, making maintenance easier.
Excavator Ton | (A)Maximum working Length of arm | (B)Maximum digging height | Shell bucket volume(cbm) |
6-10T | 7600 | 10000 | 0.2-0.3 |
11-15T | 10500 | 14000 | 0.4-0.6 |
20-27T | 12500 | 16000 | 0.8-1.5 |
30-35T | 15500 | 20000 | 1.3-1.6 |
30-35T | 20500 | 25000 | 1.0-1.4 |
40-45T | 20500 | 25000 | 1.8-205 |
40-45T | 25100 | 30000 | 1.4-2.0 |
1. Excavator High Reach Demolition Boom Arm
✅Seamless precision steel pipe
✅Centralized lubrication system
✅The boom seat sleeve adopts all in one molding process
✅Hydraulic pipelines section design, convenient for later maintenance
2. Excavator Pile Driving Boom Arm
✅ The angle between boom and horizon can reach 88°
✅The angle between boom and arm can reach 160°
✅Comparing with the same length pile driving arm, ours can pile higher.
3. Excavator Shorten Arm
✅Stop valves prevent oil leakage when replacing breaker by bucket.
✅Multi-layer welding of pipe connectors to reduce the risk of oil leakage
✅Cylinder protective cover is beneficial to preventing the cylinder from being damaged in collision
✅Q355B material, using high-quality accessories, full weld, double plate reinforcement in the stress position, etc.
4. Excavator Sliding Arm
✅Built-in antiwear plastic slider for easy replacement and maintenance
✅The double oil seal design for the telescopic cylinder prolongs its service life
✅The whole plate is cut, not spliced, so as to be more firm and not easy to deform
✅Steel sliders are welded between the skateboards to avoid direct contact wear
6. EXCAVATOR LONG REACH
✅The pipeline we use is international seamless precision pipeline.
✅The bushing on the boom base we use graphite alloy copper sleeve ,and other place we use steel bushing for easy maintenance
✅Chamfering bevel before welding, our muti-layer welding is full and smooth with many year professional experence .
✅Rivers cleaning dregging project
ZHONGHE triple quality control system
The first system is the technical design drawing review mechanism,
The second system is the semi-finished product review mechanism,
(each process has a detection testing for the previous process)
The third system is the finished product testing.
(Before painting, the overall inspection is carried out to check whether the design size matches the welding size, and whether the installation size meets the design requirement.)
To sum up, every single ZHONGHE product has been passed the above three-stage inspection system to ensure that is qualified before shipping.
Global Distribution and Transportation
Our products have been exported to over 60 countries worldwide. We utilize a variety of transportation methods to deliver our goods, including sea freight, land transportation via truck or rail, and air cargo services.
Packaging Solutions:
Our packaging options include wooden crate/box packaging as well as stretch film/shrink wrap packaging. Prior to shipment, the goods are carefully packed and secured to ensure their safe arrival at the final destination.
Container Loading:
After the products are packaged, they are then loaded into shipping containers to protect the cargo during transit. This end-to-end approach allows us to deliver our products to customers around the globe in a safe and reliable manner.
In summary, our comprehensive shipping and packaging capabilities enable us to efficiently distribute our products to more than 60 countries through a combination of sea, land, and air transportation, while maintaining the integrity of the goods through robust packing and containerization methods.
Usually use 40GP container to load product !
What type of model can directly install a 30 meter telescopic arm
A: In the absence of a nitrogen cylinder, the generally 30-meter telescopic arm can be installed by more than 450 machines, with 2.2 square shell buckets and 1 square grab buckets. If the nitrogen cylinder is added, the machine above 350 (including 350) can also be equipped with 30 meters telescopic arm and 2.2 square shell bucket. Whether it is 350 or 450 machine, the installation of 30 meters of telescopic arm is required to increase the counterweight to stabilize, 350 machine, it is recommended to increase the counterweight of 8 tons, 450 machine is recommended to increase the counterweight of 4 tons.What is a nitrogen cylinder and how does it work
What is a nitrogen cylinder and what is its working principle?
A: The nitrogen cylinder needs to be filled with nitrogen, why choose nitrogen? The first nitrogen is an inert gas, inactive; Second nitrogen, why can you install a longer telescopic arm if you install a nitrogen cylinder? The telescopic arm is relatively heavy, and the downward pressure of the telescopic arm depends on gravity, and the power support of the excavator is not required. The problem occurs when lifting the big arm, the weight of the telescopic arm during load far exceeds the weight of the original arm load, exceeds the ultimate load capacity of the big arm cylinder, and can not lift the big arm, or the phenomenon of slow lifting. In the face of this phenomenon, there are two solutions, the first is to increase the oil cylinder, the second method is to install a nitrogen cylinder. Enlarging the cylinder will not only cause the cylinder to meet the big arm, but also prone to a series of failure problems of high engine water temperature.
The second method is to install a nitrogen cylinder, the downpressure of the telescopic arm is enough, the lifting capacity is not enough, the principle of the nitrogen cylinder is to always give the big arm an upward lifting force, which increases the lifting force, while reducing the load of the engine, and fuel saving
Contact sophia to inquiry details !